How are files, versions and handoff arranged for a schedule pilot?
Practical handoff detail for a pilot, including manifest files, release versioning, checksums, schema versions, seed documentation and a feedback loop for corrections back to MirrorFirm.
A pilot is easier to evaluate when delivery is predictable. These arrangements can be agreed in scoping.
**Manifest.** Each release includes a `manifest.json` listing files, row counts per table, schema versions, generation parameters and a checksum for every file. Verify checksums on receipt.
**Layout.** A typical tree has `tables/` for Parquet, `episodes/` for JSONL, `policies/` for versioned documents, `schemas/` for JSON Schema files and `graders/` for task specifications.
**Versioning.** Releases carry a version label, and any correction produces a new label with a changelog describing which task IDs changed and why. Old labels remain reproducible so earlier scores can be rerun.
**Seeds.** Each task records `variant_seed` and `generator_version`, so a specific start state can be rebuilt or varied.
**Environment pilots.** If you are trialling a simulated environment, agree how it is provided, how `reset(seed)` is called and how event logs are exported to your storage.
**Feedback path.** Return findings as a table keyed by `episode_id` or `task_id`, with the failing check named. This keeps corrections specific.
All content is generated. Keep your own record of the disclosure and grounding review you performed on each release.
A manifest, versioned schemas and a defined feedback path make a pilot repeatable, so corrections can be tracked and reruns compared.
- Audience:
- Model labs
- Content type:
- Integration
- Buyer question:
- Scope and getting started
Content release: r-a220eb6e099b243b
Related questions
- What might a first pilot look like for a delivery scheduling agent?
- How do I wire a first pilot into my agent stack?
- What limits and licence questions should I raise before starting?
- How should I scope and license a schedule dataset or environment?
- How should a pilot release be delivered and versioned for my pipeline?
- What licensing terms and limits apply to generated schedule data?