What grading inputs and result records support evaluation of a schedule task pack?
Specifies task definition fields, a per-run result record, useful metrics such as date-only match and recovery after tool errors, and what to request in a pilot.
Evaluation works best when the grader reads the same files your customers load. A task pack can ship a small set of structured grading inputs alongside the data.
A task definition in JSONL might carry:
- `task_id`, `instruction`, `start_snapshot` - `allowed_actions`, a list of tool names - `expected_final_state`, a reference to the target schedule version - `required_steps`, such as approval before commit - `forbidden_effects`, such as a notice sent for an unapproved plan - `tolerance`, the rounding allowance in currency units
A grader can then produce a result record per run: `run_id`, `task_id`, `final_schedule_match`, `step_order_ok`, `policy_violations`, `rounding_delta` and `notes`. Storing these as Parquet makes comparison across model versions straightforward.
Useful metrics to ask for:
- exact match of the final instalment lines - match on due dates only, to separate date logic from arithmetic - policy adherence across tasks that should be refused - recovery after a tool error, using a fault-injected step
Request the grader code or specification in the pilot, plus a reset method for each task. A reseller can then offer evaluation-ready packs, with clear notes that the underlying content is generated and that grading logic should be reviewed by the buyer.
Structured task definitions and per-run result records let you compare model versions and offer evaluation-ready packs.
- Audience:
- Licensed resellers
- Content type:
- Integration
- Buyer question:
- How to evaluate it
Content release: r-a220eb6e099b243b
Related questions
- How can a grader catch a quiet error in a premium instalment change?
- How do I check grounding and disclosure risk in generated data?
- How do I judge the quality of generated schedule data?
- How do state diffs, graders and hooks fit into a schedule evaluation?
- What success criteria should I set for a schedule agent evaluation?
- How does an evaluator catch rounding drift when an agent splits an instalment plan?